Fixed time-schedules
As soon as existing routes are sent to calculation through the reference planning, it is then possible to add additional constraints to their schedules (start of the route, operations hours) by fixing them to an arbitrarily chosen value.
For a given route, it is possible to:
- fix its start date,
- fix the schedules of its transport operations
📄️ Fixed time-schedule of an operation
There are two existing routes scheduled on the availability period of the vehicle, and we need to fix the schedule of an operation to an arbitrarily chosen date.
📄️ Fixed start date of a route
There are 2 existing routes scheduled on the vehicle availability period, and we want to start the first route of this period at an arbitrarily chosen date.